Rapid commercial EV charger installations are the future of all ev charging solutions period!
All commercial electric fleet operators, big or small, need fast reliable ev charging solutions.
Rapid ev chargers that enable your electric vehicle fleet to stay charged and operational for business.
At car-charger.uk we offer rapid ev charger supply and installation along with new power infrastructure for your site.
Providing all the planning and Management with the DNO.
Including all infrastructure road digging, substation upgrades and new low and high voltage connections.
Your one stop provider for all the necessary engineering works and hardware supply to bring rapid charging solutions to your site.
Rapid 1 -2 hour full battery vehicle charging
Options to connect to the vast public EV Charging network
Attract more customers to your site
Monetized charging solutions
Remote tariff modifications
+ much much more
Commercial EV Charger Installation Requirements
Fill out your details below and a member of the team will be in contact
Thank you for contacting us.
A member of the team will get back to you within the hour.
Speak to an operator now to book a rapid charger consultation
Public rapid ev charging is the future for ev mobility.
High power direct current(DC) charging via the ccs-2 connector on an ev is known as rapid charging. You can achieve 50-80% charge from a rapid charging session in 15-20mins (150kW Super Charger+). Rapid dc charging helps reduce indidivdual charging sessions and free up the public charging network.
The speed of the charging sessions depends on the rapid charger power and the vehicles battery capability.
The vast majority of rapid chargers in the UK offer 50-60kw rapid charging sessions.
There are also a limited amount of 350kw super chargers in the UK .
Why not supply all commercial ev charger installations with 350kW Super Chargers you may ask.
The simple answer is the more powerful the charger, the bigger the demand on the national electric grid.
The grid, like all existing infrastures, needs time to expand and grow with all the new ev charging demands.
This will require new cables laid, new substations and extentive road works.
In the midst of this of growth, 50-60kw chargers are great retro fit solutions that minimize grid demand and your site power infrastrure upgrades. Providing a rapid commercial ev charger installation thats a balance between good rapid charging sessions and minimal network disturbance.
Theres two factors to consider in the answer to this question:
An assessment of the electrical supply to your site is required. Rapid charging will a require a new low or high voltage connection from the existing power grid. Two rapid chargers (50-60kW) demanding between 69kVA - 200kVA will need a new low voltgae connection. Four rapid chargers demanding above 250kVA will require a new high voltage connection and your own site substation to be installed.
22kw Business EV Charger Installations can provide a full electric vehicle charge in an average 5-8 hours. The 22kW EV Charger requires 3 phase power on your site. These would place an additonal 60-65kVA demand on your premises and may be able to be supplied from your exisiting electrical consumer board.
We offer full service and maintenance of our rapid ev chargers installations.
Our fully trained and insured engineers will ensure your charging network stays operational.
This is managed through an ocpp server connection to our backend software management system.
Our software management system enables :
Remote mangement
Fault diagnistics
Payment processing
Roaming network connection
Dynamic load managmen
+ loads more
Car Parks
Increase Revenue
Hospitals
Improved Facilities
Hotels
Attract more visitors
Retail stores and supermarkets
Increase consumer volume
For 4+ rapid chargers (250kVA+), you will likely need a new electrical connection from High Voltage (HV) distribution network
This will require an onsite substation.
For 2 fast or rapid chargers (69kVA to 200kVA), you will likely need a new electrical connection from the Low Voltage(LV) distribution network.
For a couple of fast chargers at a workplace (up to 69kVA), you will likely be able to connect to your existing supply through the distribution board.
All Rights Reserved |